Incept AP Coverage Dashboard
Loop status — headline
Per-subject status of the four system-side automation stages that contribute to the overall verdict (Diagnose, Score, Decide, Act). Three additional stages are tracked separately because they're universally open today: Pre-test (mastered prereqs?), Diagnostic (XP-to-completion estimator), and Re-test (assigning a new test). Re-test is blocked by external-platform access; Pre-test and Diagnostic are unbuilt capabilities. None of the three are rolled into the overall verdict because doing so would collapse all variation across subjects.
Coverage matrix
What's wired up for each enrolled AP subject. Integrations is the Common Core Crawl — 7 external test-source pipelines we plan to ingest from. Hover a row for notes and caveats; hover an integration pill for source details.
| Subject | Students | Exam | Hole-filler | FRQ grader | Grading | Calibrated | Integrations | Loop |
|---|
Loop status by subject
Per-stage view of where each subject sits along the loop. Useful for spotting which stage breaks first when something is open.
| Subject | Pre-test | Diagnose | Diagnostic | Score | Decide | Act | Re-test |
|---|
Cross-repo contradictions & coverage gaps
Where the seams between hole-filler, FRQ grader, and CED don't agree. Each item names the operational impact and the fix.